613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WV
Tender description
INTRODUCTION: This Sources Sought Notice is for market research and information purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs (VA). The Department of Veterans Affairs, Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is conducting a market survey and is seeking potential sources for the EHRM Infrastructure Upgrades Construction project at the Martinsburg VA Medical Center located in Martinsburg, WV. PROJECT DESCRIPTION: The scope of work shall generally consist of but is not limited to the following: construction work to facilitate all modifications at existing buildings on the campus to upgrade the infrastructure to support the new Electronic Health Records Modernization (EHRM) system. The Martinsburg VAMC is seeking a general contractor to furnish all labor, materials, supervision and perform all work necessary to complete EHRM Infrastructure Upgrades at the Martinsburg VA Medical Center. Contractor shall completely prepare site for building operations, including demolition and removal of existing construction, and furnish labor and materials and perform work for Martinsburg VA Medical Center, EHRM Infrastructure Upgrades, as required by drawings and specifications.
Eligibility criteria
The full eligibility and assessment pack is released with the tender documents.
Get the full tender details
The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.
- Contracting authority
- Contact information
Similar open tenders
Bidding for this one?
The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.
Want help winning one of these?
We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.