Closing soonInfrastructure & transport

DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV

Deadline: 10 Nov 2026, 23:59 6 days left United Kingdom · UK-wide Published on Contracts Finder Added 26 Oct 2026

Tender description

The B55 and B55.2 demolition project at Sellafield involves the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall, located within the WAGR complex, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, together with segregation and processing of demolition arisings, backfilling of voids and final site clearance. A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain operational and be protected from demolition impacts, dust and water ingress throughout the works. Retained basements and associated structures also require protection, while uncertainties associated with ageing structures, buried services, below-ground voids and incomplete historical information must be managed through robust surveys, demolition engineering and risk-informed planning. Overall, the project is intended to provide a safe, demolition-led solution that reduces workforce exposure, removes redundant infrastructure and supports accelerated hazard reduction across the wider WAGR decommissioning programme. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract

Eligibility criteria

The full eligibility and assessment pack is released with the tender documents.

Get the full tender details

The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.

  • Contracting authority
  • Budget
  • Contact information
Next step

Bidding for this one?

The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.

Want help winning one of these?

We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.

See how we work