Electrical Upgrades to the GCAFB/Tanker Base/Fire Cache
Tender description
This is a combined synopsis/solicitation for commercial construction items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0015 is issued as a Request for Quotation (RFQ) for Electrical Upgrades to the Grant County Aeriel Fire Base and Tanker Cache on the Gila National Forest. This project consists of furnishing and installing a complete, code-compliant electrical distribution system to support a designated concrete pad area at the tanker base/fire cache, and the upgrade of an existing electrical/motor control panel serving the retardant pumping system. The completed system shall be suitable for continuous outdoor service in a high-use industrial environment and designed for durability, safety, and future expansion. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210. The small business size standard is $19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Eligibility criteria
The full eligibility and assessment pack is released with the tender documents.
Get the full tender details
The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.
- Contracting authority
- Contact information
Similar open tenders
(1917) Te Wharekura o Rākaumangamanga #262010 Block P: Gym Refurbishment
10414239
15107 - Lyttelton to Timaru Corridor Strategic Transport Plan - PS
Bidding for this one?
The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.
Want help winning one of these?
We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.