Ireland – Building services consultancy services – Consultant for approved Climate Action and Mechanical project (Summer Works) for Quignamanger National School 15257V
Tender description
The existing LPHW Space Heating installation in the original school building dates back to the time of construction of the building in 1983 and is in a poor condition at this stage and requires to be replaced. There is no cavity insulation in the 1983 building, with only 100 mm of attic insulation in this section of the building also. The proposed Climate action works consist of the provision of the top up of the existing attic insulation, provision of pumped cavity wall insulation, provision of a heat pump system and the provision of an twin EV Charging pedestal. The area of the building for which the proposed works are required consist of the original 1983 school building which has a total floor area of approx. 1235m2 and comprises 8 number mainstream classrooms, resource rooms, staff room, library, offices, male and female toilets and staff toilets, GP Hall, heating centre, stores, and circulation areas. Approximate budget for the project is €680,000
Eligibility criteria
The full eligibility and assessment pack is released with the tender documents.
Get the full tender details
The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.
- Contracting authority
- Contact information
Similar open tenders
Belgium – Architectural and related services – Het aanstellen van een architect voor ontwerp en realisatie van de renovatie van het hoofdgebouw op de Deynecampus
Multi-Award Multi-Platform OTA
Portugal – Accommodation, building and window cleaning services – AQUISIÇÃO DE SERVIÇOS DE HIGIENE E LIMPEZA PARA O DEPÓSITO GERAL DE MATERIAL DA FORÇA AÉREA E PARA O CENTRO DE ENG
Bidding for this one?
The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.
Want help winning one of these?
We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.