OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Tender description
PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD
Eligibility criteria
The full eligibility and assessment pack is released with the tender documents.
Get the full tender details
The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.
- Contracting authority
- Contact information
Similar open tenders
(1917) Te Wharekura o Rākaumangamanga #262010 Block P: Gym Refurbishment
10414239
15107 - Lyttelton to Timaru Corridor Strategic Transport Plan - PS
Bidding for this one?
The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.
Want help winning one of these?
We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.