Provision of BMS System MEICA-BMS-01
Tender description
The scope of works includes a two-stage delivery approach covering the complete design, supply, configuration, integration, testing and installation of the Building Management System for Canley Brook, Burton Green and Stoneleigh Pumping Stations under the HS2 N1/N2 MEICA works. The centralised system at each location shall comprise of a dedicated BMS panel with dual-redundant PLCs, HMIs, remote interface enclosures and a dedicated BMS LAN, and distributed interface enclosures located within the relevant plant rooms to facilitate communications between plant systems and provide connectivity to the HS2 Network Integrated Control Centre (NICC). The BMS shall integrate the mechanical and electrical building services, providing monitoring, control, alarm management, and operator interfaces for the pumping stations and portal building. The system shall be designed in accordance with the project control strategy and applicable HS2 technical standards while coordinating with interfacing subcontractors to ensure seamless integration of all connected systems. The proposed BMS shall provide monitoring, control, alarms and graphical visualisation for HVAC, LV distribution and metering, UPS, lighting, fire alarms, public health services, pumped drainage and disabled toilet alarms. The scope also includes reviewing design inputs, updating the Functional Design Specification and generic drawings, and coordinating all interfaces required for full mechanical and electrical system integration. Sella Controls will also assess the cyber security risks associated with the BMS system. Additional information: Please review the Scope of work and drawings for the works.
Eligibility criteria
The full eligibility and assessment pack is released with the tender documents.
Get the full tender details
The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.
- Contracting authority
- Budget
- Contact information
Similar open tenders
Bidding for this one?
The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.
Want help winning one of these?
We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.