ActiveProfessional services

RWP - Extreme Loads Tire Force Machine (ELTFM)

Deadline: 18 Dec 2026, 23:59 26 days left United States · Nationwide (federal) Published on SAM.gov Contract Opportunities Added 20 Nov 2026

Tender description

RWP DUE DATE HAS BEEN EXTENDED TO 18 DECEMBER 2026 ___________________________ To: AEDC Velocity Alliance Consortium and Industry Partners via SAM.gov Project Title: Extreme Loads Tire Force Machine (ELTFM) Contracting Organization: AFTC/PZ (Arnold) Applicable NAICS Code: 334519 � Other Measuring and Controlling Device Manufacturing (Physical Properties Testing Equipment) Applicable PSC Code: 6635 � Physical Properties Testing and Inspection Equipment Acquisition Authority: 10 U.S.C. � 4022 � Other Transaction Authority for Prototypes Offerors may recommend an alternate NAICS or PSC code for consideration. The 704th Test Group (704 TG) Aerospace Survivability and Safety Office (OL-AC) at Wright- Patterson AFB, Ohio, requires an advanced, state-of-the-art testing capability to replace its legacy Tire Force Machine (TFM). Currently, the legacy system cannot meet the high vertical and lateral load requirements of current tire test profiles. To bridge this critical testing gap, the Government is initiating the Extreme Loads Tire Force Machine (ELTFM) prototype project. The ELTFM is conceived as a unique, high-capacity dynamic test machine designed to bridge the operational gap between high-speed dynamometer force testing and static load presses. See request for white paper attached for details. NOTE: The requirement documents for this effort are marked Distribution D and/or Export Controlled. For access to these documents, please provide your company's CAGE to the POCs listed. Once CMMC Level 2 (Self) and JCP certification are confirmed, the documents will be sent via DoD SAFE.

Eligibility criteria

The full eligibility and assessment pack is released with the tender documents.

Get the full tender details

The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.

  • Contracting authority
  • Contact information
Next step

Bidding for this one?

The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.

Want help winning one of these?

We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.

See how we work