Closing soonProfessional services

S208--FY27 Holiday Decorations Furnish, Install and Remove

Deadline: 18 Nov 2026, 23:59 2 days left United States · Nationwide (federal) Published on SAM.gov Contract Opportunities Added 17 Nov 2026

Tender description

RFQ 36 C24827Q0122 - Questions and Answers 1. Amendment 0001 updates the pricing schedule to installation and removal. Will the VA be providing the Christmas trees and decorations, or is the contractor still responsible for furnishing all materials? The contractor must supply all decorations, including, but not limited to trees, garlands, ribbons, lights, materials needed to install and remove items after the holidays, etc. 2. If the contractor is responsible for furnishing the decorations, are there existing trees or decorations available for reuse at any of the locations? No. 3. For the eight 12-foot Christmas trees, are there specific requirements regarding tree type, lighting, ornament quantities, or overall design beyond the red, white, and blue color scheme? Only that it is UL listed and meets all fire codes for a hospital.� Please explain or provide photos of what will be provided / included in the bid. 4. Regarding the 20-foot exterior tree, is there an existing structure or designated installation area? Will the contractor be responsible for providing the supporting structure and electrical connections? The 20-foot exterior tree being requested is only lights.� There is not a structure available.� � Electrical connection by the VA. 5. Will the contractor have access to electrical outlets at each location, or should temporary power and extension equipment be included in our pricing? Electrical outlets are provided in each location.� Extension cords may be needed to reach electrical outlet. 6. Are there any restrictions on the use of ladders, lifts, or other installation equipment at the facilities? Lifts and ladders may be used; areas will need to be blocked off for public / patient safety while in use. 7. Does the VA have a preferred installation schedule for each location, or can the contractor coordinate installation dates directly with the facility POCs as long as everything is completed by November 30? There is not a set schedule. The contractor can coo

Eligibility criteria

The full eligibility and assessment pack is released with the tender documents.

Get the full tender details

The contracting authority, budget, contact details and document pack are shared with the organisations we support on this opportunity. Tell us you are interested and we will come back within one business day.

  • Contracting authority
  • Contact information
Next step

Bidding for this one?

The team behind this board writes the response, shapes the evidence and keeps the submission moving. Read the workstream that fits before the closing date does.

Want help winning one of these?

We write the response, shape the evidence and keep the submission moving — from a single workstream to the whole bid.

See how we work